logo

Standards Manage Your Business

We Manage Your Standards

ISO

IWA 33-3:2021

Technical guidelines for the development of small hydropower plants — Part 3: Design principles and requirements

Standard Details

This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments.

Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.

General Information

Status : Published
Standard Type: Main
Document No: IWA 33-3:2021
Document Year: 2021
Pages: 80
Edition: 1
  • ICS:
  • 27.140 Hydraulic energy engineering

Life Cycle

Currently Viewing

Published
IWA 33-3:2021
Knowledge Corner

Expand Your Knowledge and Unlock Your Learning Potential - Your One-Stop Source for Information!

© Copyright 2024 BSB Edge Private Limited.

Enquire now +