Standard Test Method for Cummins ISM Test
1.1 The test method covers a heavy-duty diesel engine test procedure conducted under high soot conditions to evaluate oil performance with regard to valve train wear, top ring wear, sludge deposits, and oil filter plugging in an EGR environment. This test method is commonly referred to as the Cummins ISM Test.2
1.2 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard.
1.2.1 Exception—The only exception is where there is no direct SI equivalent such as screw threads, national pipe threads/diameters, tubing sizes, or where there is a sole source of supply equipment specification.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. See Annex A1 for general safety precautions.
1.4 Table of Contents:
Section | |
Scope | 1 |
Referenced Documents | 2 |
Terminology | 3 |
Summary of Test Method | 4 |
Significance and Use | 5 |
Apparatus | 6 |
Test Engine Configuration | 6.1 |
Test Engine | 6.1.1 |
Oil Heat Exchanger, Adapter Blocks, Block Off Plate | 6.1.2 |
Oil Filter Head Modification | 6.1.3 |
Oil Pan Modification | 6.1.4 |
Engine Control Module (ECM) | 6.1.5 |
Engine Position Sensor | 6.1.6 |
Intake Manifold Temperature Sensor | 6.1.7 |
Barometric Pressure Sensor | 6.1.8 |
Turbocharger Controller | 6.1.9 |
Power Supply Voltage | 6.1.10 |
Air Compressor and Fuel Pump | 6.1.11 |
Engine Block Preparation | 6.1.12 |
Test Stand Configuration | 6.2 |
Engine Mounting | 6.2.1 |
Intake Air System | 6.2.2 |
Aftercooler | 6.2.3 |
Exhaust System | 6.2.4 |
Exhaust Gas Recirculation System | 6.2.5 |
Fuel System | 6.2.6 |
Coolant System | 6.2.7 |
Pressurized Oil Fill System | 6.2.8 |
External Oil System | 6.2.9 |
Crankcase Aspiration | 6.2.10 |
Blowby Rate | 6.2.11 |
System Time Responses | 6.3 |
Oil Sample Containers | 6.4 |
Mass Balance | 6.5 |
Engine and Cleaning Fluids | 7 |
Test Oil | 7.1 |
Test Fuel | 7.2 |
Engine Coolant | 7.3 |
Pentane | 7.4 |
Solvent | 7.5 |
Preparation of Apparatus | 8 |
Cleaning of Parts | 8.1 |
General | 8.1.1 |
Engine Block | 8.1.2 |
Cylinder Head | 8.1.3 |
Rocker Cover and Oil Pan | 8.1.4 |
External Oil System | 8.1.5 |
Crosshead Cleaning and Measurement | 8.1.6 |
Rod Bearing Cleaning and Measurement | 8.1.7 |
Ring Cleaning and Measurement | 8.1.8 |
Injector Adjusting Screw Cleaning and Measurement | 8.1.9 |
Engine Assembly | 8.2 |
General | 8.2.1 |
Parts Reuse and Replacement | 8.2.2 |
Build-Up Oil | 8.2.3 |
Coolant Thermostat | 8.2.4 |
Oil Thermostat | 8.2.5 |
Fuel Injectors | 8.2.6 |
New Parts | 8.2.7 |
Operational Measurements | 8.3 |
Units and Formats | 8.3.1 |
Instrumentation Calibration | 8.3.2 |
Temperatures | 8.3.3 |
Pressures | 8.3.4 |
Flow Rates | 8.3.5 |
Intake and Exhaust CO2 Measurement | 8.3.6 |
Engine/Stand Calibration and Non-Reference Oil Tests | 9 |
General | 9.1 |
New Test Stand | 9.2 |
New Test Stand Calibration | 9.2.1 |
Stand Calibration Period | 9.3 |
Stand Modification and Calibration Status | 9.4 |
Test Numbering System | 9.5 |
General | 9.5.1 |
Reference Oil Tests | 9.5.2 |
Non-Reference Oil Tests | 9.5.3 |
Reference Oil Test Acceptance | 9.6 |
Reference Oil Accountability | 9.7 |
Last Start Date | 9.8 |
Donated Reference Oil Test Programs | 9.9 |
Adjustments to Reference Oil Calibration Periods | 9.10 |
Procedural Deviations | 9.10.1 |
Parts and Fuel Shortages | 9.10.2 |
Reference Oil Test Data Flow | 9.10.3 |
Special Use of the Reference Oil Calibration System | 9.10.4 |
Test Procedure | 10 |
Engine Installation and Stand Connections | 10.1 |
Coolant System Fill | 10.2 |
Oil Fill for Break-in | 10.3 |
Engine Build Committed | 10.3.3 |
Fuel Samples | 10.4 |
Engine Warm-up | 10.5 |
Shutdown During Warm-up | 10.5.1 |
Engine Break-in | 10.6 |
Shutdown and Maintenance | 10.7 |
Normal Shutdown | 10.7.1 |
Emergency Shutdown | 10.7.2 |
Maintenance | 10.7.3 |
Downtime | 10.7.4 |
200-h Test Procedure | 10.8 |
Oil Fill for Test | 10.8.2 |
Operating Conditions | 10.8.4 |
Injection Timing Change | 10.8.5 |
Mass % Soot Validity | 10.8.6 |
Test Timer | 10.8.7 |
Operational Data Acquisition | 10.8.8 |
Oil Sampling | 10.8.9 |
Oil Addition | 10.8.10 |
End of Test (EOT) | Status : ACTIVE Standard Type: Main Document No: ASTM D7468 : 22 Document Year: 2022 Pages: 36
Life CycleCurrently Viewing ACTIVE ASTM D7468 : 22 Historical Historical Historical Historical Historical Historical Historical Historical Historical Historical Historical Historical Historical Knowledge Corner Expand Your Knowledge and Unlock Your Learning Potential - Your One-Stop Source for Information! © Copyright 2024 BSB Edge Private Limited. |