Standard Practice for Length Change of Cast, Drilled, or Sawed Specimens of Hydraulic-Cement Mortar and Concrete
1.1 This practice covers the determination of the length changes of cast, drilled, or sawed specimens of hydraulic-cement mortar and concrete due to causes other than externally applied forces and temperature changes. It can be readily adapted, if desired, to studies of length change involving different schedules or environmental treatment than the standard procedures prescribed by this practice.
1.2 The values stated in either inch-pound units or SI units shall be regarded separately as standard. The units stated in each system may not be exact equivalents; therefore, each system must be used independently of the other, without combining in any way. The inch-pound units are shown in brackets.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
Currently Viewing
Expand Your Knowledge and Unlock Your Learning Potential - Your One-Stop Source for Information!
© Copyright 2024 BSB Edge Private Limited.