Hardware
5.19
Continuity Between the Fenestration Products and
 Other Components of the Building Envelope
6
Water Shedding Strategies of Wall and Roof Systems
7
 Concept of Surface Barrier Systems and
  Membrane/Drainage Systems
7.1
  Surface Barrier Systems
7.1.1
  Membrane/Drainage Systems
7.1.2
 Identification of Systems
7.2
Installation Methods For Windows
8
 Windows in Walls Utilizing a Membrane/Drainage
  System
8.1
  Windows with Perimeter Mounting Flanges
   (Nail Fins) in Drainage Type Wall Construction
8.1.1
   Flange Types
8.1.1.1
   Selection of Installation Method
8.1.1.2
    Method A
8.1.1.3.1
    Method B
8.1.1.3.2
    Method A1
8.1.1.3.3
    Method B1
8.1.1.3.4
  Non-Finned Windows in Membrane/Drainage
   Type Walls
8.1.2
 Windows in Walls Utilizing a Barrier Wall System
  (Sealant Method)
8.2
 Windows in Walls Utilizing an Exterior Barrier System
  (EIFS or Direct Applied)
8.3
 Alternative Approved Installation Methods for the
  Installation of Windows
8.4
  Extreme Wind/Water Conditions
8.4.1
   Membrane Drainage Wood Frame Construction
8.4.1.1
   Masonry Construction with Surface Barrier
    Stucco Facade
8.4.1.2
 Special Considerations
8.5
  Aluminum Framed Windows
8.5.1
  Vinyl Framed Windows
8.5.2
 Replacement Window Installation
8.6
  Partial Window Replacement for Existing Integral
   Flange Windows
8.6.1
  Partial Replacement of Mill Shop Wood Windows
8.6.2
   “Mill Shop” Wood Windows (Vertical or Horizontal
    Sliding)
8.6.2.1
  Complete Window Replacement
8.6.3
   Destructive Window Replacement (Fin Type)
8.6.3.1
   Non-Destructive Window Replacement
    (Non-Fin Type)
8.6.3.2
Installation Methods for Doors
9
 Doors in Walls Utilizing a Membrane/Drainage System
9.1
  Doors with Perimeter Mounting Flanges
   (Nailing Fins) in Drainage Type Wall
   Construction
9.1.1
   Flange Types
9.1.1.1
   Selection of Installation Method
9.1.1.2
    Method A
9.1.1.4.1
    Method B
9.1.1.4.2
    Method A1
9.1.1.4.3
    Method B1
9.1.1.4.4
  Hinged Swing (Non-finned) Doors in Membrane/
   Drainage Type Walls
9.1.2
Installation Methods for Skylights
10
 Product Types
10.1
 Flashing Procedures
10.2
 Aluminum/Copper Sheet Flashing
10.3
 Aluminum/Copper Step Flashing (Fabricated or
  Engineered)
10.4
 Membrane Flashing
10.5
Post-Installation Procedures
11
Keywords
12
Air Barrier Foam Sealant Used in the Rough
 Opening Gap
Annex A1
Emergency Escape and Rescue Requirements
Annex A2
Minimum Height Requirements for Interior Height of
 Pan Flashing
Annex A3
Sealants
Annex A4
Window/Door Flashing Types
Appendix X1
Cautions for Installation
Appendix X2
Other Referenced Installation Guides
Appendix X3
Alternate Installation Methods
Appendix X4
1.12 This international standard was developed in accordanc">
Standard Practice for Installation of Exterior Windows, Doors and Skylights 1.1 This practice covers the installation of fenestration products in new and existing construction. For the purpose of this practice, fenestration products shall be limited to windows, sliding patio-type doors, swinging patio type doors, and skylights, as used primarily in residential and light commercial buildings. 1.2 This practice assumes that the installer possesses basic woodworking skills and an understanding of wall and roof construction, sheet metal work, and joint sealant practices. 1.3 This practice attempts to instruct and familiarize the installer with the concepts of both Barrier Systems and Membrane/Drainage Systems, in order to ensure the continuity of the building envelope. This practice attempts to educate the installer, builder, architect, and other users in the identification and understanding of the water shedding system of the building envelope. 1.4 This practice covers the installation process from pre-installation procedures through post-installation procedures, for single units or factory-mulled multiple units in a single opening. It does not cover the fabrication or assembly of multiple units, whether such fabrication takes place in a factory or at the intended installation site. The installer should check with the manufacturer of factory-assembled units for instructions for anchoring. When using field-mulled units, follow manufacturer's recommendations and make certain that they meet applicable codes. This practice does not cover the selection of appropriate fenestration products for a given application, nor the selection of other products or systems for use in the installation. 1.5 This practice provides minimum requirements that will help to accomplish the installation of fenestration products in an effective manner. Actual conditions in buildings vary greatly and, in some cases, substantial additional precautions may be required. In the event that the manufacturer's installation instructions provided with the product conflict with requirements of this practice, the manufacturer's instructions shall prevail. This practice is not intended to limit or exclude other new procedures that may refine or further improve the effectiveness of fenestration installation. 1.5.1 This practice is intended to be used for background information in order to develop training manuals and training programs. Further, this practice attempts to consolidate and unify the various steps of construction, tying together the various trades involved with the continuity between fenestration products and the building envelope. 1.6 The text of this practice references notes and footnotes that provide explanatory material. These notes and footnotes (excluding those in tables and figures) shall not be considered as requirements of this practice. 1.7 This standard has not been created to address all issues related to every possible installation situation one might experience in the field. Furthermore, this practice does not purport to provide fail-safe installation methods, assurance or protection against installation deficiencies, or a standard by which architects can specify or ensure delivered performance. Note 1: There are no ISO StandardDetails covering the primary subject matter of this practice. 1.8 Design Professional—This practice is not intended to limit the role and authority of a registered design professional to select a method of installation or to change, modify, or develop other methods of installation to meet the specific requirements of a building project for a particular location. A design professional retains the authority to prepare construction documents indicating window/door/skylight installations integrated with the water-resistive barrier (WRB). 1.9 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard. 1.10 This practice does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and to determine the applicability of regulatory limitations prior to use. For specific precautionary statements, see Section 5, Related Procedures. Where a lead hazard is known or suspected, refer to ASTM StandardDetails on Lead Hazards Associated with Buildings and to applicable state and federal regulations. Where an asbestos hazard is known or suspected, refer to the ASTM Manual on Asbestos Control, and to applicable state and federal regulations. 1.11 Table of Contents: Section Scope 1 Table of Contents 1.11 Referenced Documents 2 Terminology 3 Definitions 3.1 Description of Terms Specific to this Standard 3.2 Abbreviations 3.3 Significance and Use 4 Related Issues and Procedures 5 Continuity with the Weather Barrier Systems 5.1 Joints and Anchorages 5.2 Moisture Entrapment 5.3 Water-Resistive Barrier 5.4 Weatherability 5.5 Construction Sequence 5.6 Construction Damage 5.7 Inspection 5.8 Rough Opening 5.9 Rough Opening Size 5.9.1 Insulating or Filling the Rough Opening Gap 5.9.2 Materials Protection 5.10 Cleaning and Maintenance 5.11 Dissimilar Materials 5.12 Flashing Requirements 5.13 Fastening Systems/Anchorage 5.14 Shimming 5.15 Pan Flashing Systems and Subsills for Weatherability 5.16 Pre-Installation Procedures 5.17 Sealants—Selection and Use 5.18 Window Cleaner Anchors and Related Safety 5.19 Continuity Between the Fenestration Products and 6 Water Shedding Strategies of Wall and Roof Systems 7 Concept of Surface Barrier Systems and 7.1 Surface Barrier Systems 7.1.1 Membrane/Drainage Systems 7.1.2 Identification of Systems 7.2 Installation Methods For Windows 8 Windows in Walls Utilizing a Membrane/Drainage 8.1 Windows with Perimeter Mounting Flanges 8.1.1 Flange Types 8.1.1.1 Selection of Installation Method 8.1.1.2 Method A 8.1.1.3.1 Method B 8.1.1.3.2 Method A1 8.1.1.3.3 Method B1 8.1.1.3.4 Non-Finned Windows in Membrane/Drainage 8.1.2 Windows in Walls Utilizing a Barrier Wall System 8.2 Windows in Walls Utilizing an Exterior Barrier System 8.3 Alternative Approved Installation Methods for the 8.4 Extreme Wind/Water Conditions 8.4.1 Membrane Drainage Wood Frame Construction 8.4.1.1 Masonry Construction with Surface Barrier 8.4.1.2 Special Considerations 8.5 Aluminum Framed Windows 8.5.1 Vinyl Framed Windows 8.5.2 Replacement Window Installation 8.6 Partial Window Replacement for Existing Integral 8.6.1 Partial Replacement of Mill Shop Wood Windows 8.6.2 “Mill Shop” Wood Windows (Vertical or Horizontal 8.6.2.1 Complete Window Replacement 8.6.3 Destructive Window Replacement (Fin Type) 8.6.3.1 Non-Destructive Window Replacement 8.6.3.2 Installation Methods for Doors 9 Doors in Walls Utilizing a Membrane/Drainage System 9.1 Doors with Perimeter Mounting Flanges 9.1.1 Flange Types 9.1.1.1 Selection of Installation Method 9.1.1.2 Method A 9.1.1.4.1 Method B 9.1.1.4.2 Method A1 9.1.1.4.3 Method B1 9.1.1.4.4 Hinged Swing (Non-finned) Doors in Membrane/ 9.1.2 Installation Methods for Skylights 10 Product Types 10.1 Flashing Procedures 10.2 Aluminum/Copper Sheet Flashing 10.3 Aluminum/Copper Step Flashing (Fabricated or 10.4 Membrane Flashing 10.5 Post-Installation Procedures 11 Keywords 12 Air Barrier Foam Sealant Used in the Rough Annex A1 Emergency Escape and Rescue Requirements Annex A2 Minimum Height Requirements for Interior Height of Annex A3 Sealants Annex A4 Window/Door Flashing Types Appendix X1 Cautions for Installation Appendix X2 Other Referenced Installation Guides Appendix X3 Alternate Installation Methods Appendix X4 1.12 This international standard was developed in accordanc Currently Viewing Expand Your Knowledge and Unlock Your Learning Potential - Your One-Stop Source for Information! © Copyright 2024 BSB Edge Private Limited.ASTM E2112 : 19c
Standard Details
Hardware
Other Components of the Building Envelope
Membrane/Drainage Systems
System
(Nail Fins) in Drainage Type Wall Construction
Type Walls
(Sealant Method)
(EIFS or Direct Applied)
Installation of Windows
Stucco Facade
Flange Windows
Sliding)
(Non-Fin Type)
(Nailing Fins) in Drainage Type Wall
Construction
Drainage Type Walls
Engineered)
Opening Gap
Pan FlashingGeneral Information
Life Cycle