1.1 This guide covers the selection of appropriate remedial actions at sites where a release of chemicals (for example, vapor-phase, dissolved-phase, or non-aqueous phase liquids (NAPL)) into the environment has occurred. This overall remedy selection process is illustrated in Fig. 1. The guide is intended to be applied within a risk-based corrective action (RBCA) framework.

1.5.1 Development of risk-based remedial action objectives that includes identification of complete exposure pathways and numeric remedial action levels (Section 5).

1.5.2 Development of non-risk remedial action objectives based on resource protection and other non-risk considerations. Resource protection objectives typically include numeric remedial action levels while other non-risk criteria are typically non-numeric and may include: remediation timeframe, implementability, cost effectiveness, regulatory compliance, property use requirements, liability control, and community concern (Section 5).

1.5.3 Evaluation of protectiveness to identify protective remedial actions that will be effective and timely for each risk-based remedial action objective for the site (Section 6).

1.5.4 Evaluation of the retained remedies using the non-risk remedial action objectives to identify acceptable remedial actions that satisfy the minimum level for each non-risk criterion (Section 7).

1.5.5 Remedial action selection to select the acceptable remedial action to be implemented at the site (Section 8).

1.5.6 Remedy design and implementation to ensure that the selected remedy is effectively implemented at the site and satisfies the remedial action objectives (Section 9).

1.6 This guide is intended for use in the selection of final remedial actions. This guide may also be used in the selection of interim measures provided that risk-based remedial action objectives and non-risk remedial action objectives are available for the evaluation of these interim measures.

1.7 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard.

1.8 This guide is not intended to specifically address contractor health and safety issues. It is the responsibility of the user of this guide to ensure that Occupational Safety and Health Administration (OSHA) regulatory requirements are met,and appropriate industry practices are consulted for guidance.

1.9 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

General Information

Status : Historical
Standard Type: Main
Document No: ASTM E2616 : 09(2014)
Document Year: 2009
Pages: 17
  • Section Volume:
  • 11.05 Volume 11.05 Environmental Assessment, Risk Management and Corrective Action
  • ICS:
  • 13.020.30 Environmental impact assessment

Life Cycle

Currently Viewing

Historical
ASTM E2616 : 09(2014)
Knowledge Corner

Expand Your Knowledge and Unlock Your Learning Potential - Your One-Stop Source for Information!

© Copyright 2024 BSB Edge Private Limited.

Enquire now +