logo

Standards Manage Your Business

We Manage Your Standards

IEC

IEC 63132-1:2020 (EN-FR)

Guidance for installation procedures and tolerances of hydroelectric machines - Part 1: General aspects

Standard Details

The purpose of IEC 63132-1:2020 is to establish, in a general way, suitable procedures and tolerances for the installation of hydroelectric turbines and generators. This document presents a typical assembly. There are many possible ways to assemble a unit. The size of the machines, design of the machines, layout of the powerhouse and delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences. It is understood that a publication of this type will be binding only if, and to the extent that, both contracting parties have agreed upon it. Installations for refurbishment projects or for small hydro projects are not in the scope of this document. An agreement between all parties is necessary. This document excludes matters of purely commercial interest, except those inextricably bound up with the conduct of installation. The tolerances in this document have been established upon best practices and experience, although it is recognized that other standards specify different tolerances. Wherever this document specifies that documents, drawings or information is supplied by a manufacturer (or manufacturers), each individual manufacturer will furnish the appropriate information for their own supply only.

General Information

Status : ACTIVE
Standard Type: Main
Document No: IEC 63132-1:2020 (EN-FR)
Document Year: 2020
Pages: 53
Edition: 1.0
  • Section Volume:
  • TC 4 Hydraulic turbines
  • ICS:
  • 27.140 Hydraulic energy engineering

Life Cycle

Currently Viewing

ACTIVE
IEC 63132-1:2020 (EN-FR)
Knowledge Corner

Expand Your Knowledge and Unlock Your Learning Potential - Your One-Stop Source for Information!

© Copyright 2024 BSB Edge Private Limited.

Enquire now +