logo

Standards Manage Your Business

We Manage Your Standards

ISO

ISO 4917-6 : 2024

Design of nuclear power plants against seismic events — Part 6: Post-seismic measures

Standard Details

This document applies to nuclear power plants with water cooled reactors.

This document does not apply to earthquakes stronger than the design basis earthquake.

This document specifies guidance on the actions to be taken in preparation for and following an earthquake at a nuclear power plant. This document is intended to be used as a guideline for decision making regarding continued operation, shutdown and restart of the nuclear power plant after an earthquake. It can also be used to assist operating organizations in the preparation and implementation of an overall pre- and post-earthquake action programme for dealing with situations in accordance with the level of seismic ground motion experienced at the site, and the seismic design level of the plant.

General Information

Status : Published
Standard Type: Main
Document No: ISO 4917-6 : 2024
Document Year: 2024
Pages: 12
Edition: 1

Life Cycle

Currently Viewing

Published
ISO 4917-6 : 2024
Knowledge Corner

Expand Your Knowledge and Unlock Your Learning Potential - Your One-Stop Source for Information!

© Copyright 2024 BSB Edge Private Limited.

Enquire now +