logo

Standards Manage Your Business

We Manage Your Standards

IEC

IEC 61850-7-410:2012+AMD1:2015 CSV (EN-FR)

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

Standard Details

IEC 61850-7-410:2012+A1:2015 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant. This consolidated version consists of the second edition (2012) and its amendment 1 (2015). Therefore, no need to order amendment in addition to this publication.

General Information

Status : ACTIVE
Standard Type: Main
Document No: IEC 61850-7-410:2012+AMD1:2015 CSV (EN-FR)
Document Year: 2015
Pages: 284
Edition: 2.1
  • Section Volume:
  • TC 57 Power systems management and associated information exchange
  • ICS:
  • 33.200 Telecontrol. Telemetering

Life Cycle

Currently Viewing

ACTIVE
IEC 61850-7-410:2012+AMD1:2015 CSV (EN-FR)
Knowledge Corner

Expand Your Knowledge and Unlock Your Learning Potential - Your One-Stop Source for Information!

© Copyright 2024 BSB Edge Private Limited.

Enquire now +